0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo was taken on
Sunday 11th November 2018 the
lower LH cylinder fitted bolts were
installed at SVR Bridgnorth a
week earlier on 4.11.18.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Smaller Magnetic Drill (borrowed from
4150 Group) in use to drill upper holes
in RH cylinder at SVR Bridgnorth on
Sunday 11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Carl Jones and Andy Poole drilling the
upper holes in the RH cylinder block
at SVR Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
'Warwickshire' with
holes being drilled
into RH cylinder by
Andy Poole, Robin
and Carl Jones at SVR
Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Top flange of RH cylinder block with all
5 holes drilled through prior to being
reamed and fitted bolts inserted at
SVR Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Carl Jones reaming first hole of upper
row of holes in RH cylinder at SVR
Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Andy Poole using using air drill to ream
remaining holes on upper row prior to
inserting fitted bolts at SVR Bridgnorth
on Sunday 11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Reamer breaking through second hole
of top row in RH cylinder at SVR
Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Carl Jones turning down one of the
fitted bolts prior to insertion in
reamed hole of cylinder block
at SVR Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
One of the fitted bolts being measured
after being turned down at SVR
Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Andy Poole and Robin Jones using the
magnetic drill to drill pilot holes in the
LH cylinder at SVR Bridgnorth on
Sunday 11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Carl and Robin Jones and Andy Poole
drilling top row of holes in LH cylinder
at SVR Bridgnorth on Sunday
11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
8 out of 10 cylinder fitted bolts in postion
on the RH side and the heads given a coat
of red oxide primer at SVR Bridgnorth
on Sunday 11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
LH frame showing bottom fitted bolts
with heads given a coat of red oxide
primer and upper holes drilled but
not yet reamed as SVR Bridgnorth
on Sunday 11th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo was taken on Sunday
25th November 2018 the cylinder covers
were actually fitted a week before on
18.11.18 at SVR Bridgnorth.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo was taken on Sunday
25th November 2018 the final top row of
fitted cylinder bolts were installed a week
before on 18.11.18 at SVR Bridgnorth.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo was taken on Sunday
25th November the final upper cylinder
fitted bolts were fitted a week before
on 18.11.18 at SVR Bridgnorth.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo was taken on Sunday
25th November 2018 the front buffer
was bolted back in place a week before
on 18.11.18 at SVR Bridgnorth.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo of front bufferbeam
attached to LH frame brackets was taken
at SVR Bridgnorth on Sunday 25th
November 2018 the bufferbeam
was actually fitted a week
before on 18.11.18.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Although the photo of front bufferbeam
attached to RH frame brackets
was taken on Sunday 25th November
at SVR Bridgnorth the bufferbeam
was actually fitted a week
earlier on 18.11.18.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
First view of driving wheel sets and
axleboxes which had kindly been
positioned (at our request) in front
of the frames at SVR Bridgnorth
on Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Driving wheels and axleboxes positioned
in front of frames at SVR Bridgnorth on
Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH axleboxes laid out alongside
wheelsets at SVR Bridgnorth on
Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Brake hanger pivot after removal
from LH frame at SVR
Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing wheelset having its journals
prepared prior to fitting axlebox
at SVR Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2046 of 1926 'Warwickshire'
RH leading brake pivot about to be
stamped with identifying letters and
numbers prior to being removed at
SVR Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Axlebox assembly being dismantled
prior to being fitted onto journal
at SVR Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Old boiler, smokebox and saddletank
mounted on a well wagon in shed
yard at SVR Bridgnorth prior to
being transported down to Bewdley
on Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Saddletank, smokebox and old boiler
mounted on a well wagon in the shed
yard at SVR Bridgnorth prior to being
transported down to Bewdley on
Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
View of wheelsets and axleboxes
in front of frames at SVR Bridgnorth
on Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
WILT Volunteer Fitters preparing
to fit axleboxes to wheelsets at
SVR Bridgnorth on Sunday
25th November 2018.
(photo: courtesy of Nigel Cripps)
0-6-0ST MW2047 of 1926 'Warwickshire'
WILT Volunteer Fitters in the process
of fitting axleboxes to wheelsets
at SVR Bridgnorth on Sunday
25th November 2018.
(photo: courtesy of Nigel Cripps)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH leading axlebox fitted to journal
at SVR Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing LH axlebox in the process of
being fitted at SVR Bridgnorth on
Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Cylinder & Valve Covers with retaing
nuts given a coat of red oxide
primer at SVR Bridgnorth on
Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH Axleboxes fitted to wheelsets
at SVR Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Front buffer beam re-fitted to front
end of frames at SVR Bridgnorth on
Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Fitted bolts securing LH
cylinder casting to frames
at SVR Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Old boiler, smokebox and saddletank
on well wagon just prior to departure
from SVR Bridgnorth on the journey
down to Bewdley behind Class 33 No.
33108 on Sunday 25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing and Driving wheelsets
complete with axleboxes at SVR
Bridgnorth on Sunday
25th November 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Saddletank, smokebox and old boiler
on well wagon about to depart from
SVR Bridgnorth on Sunday 25th
November 2018 bound for Bewdley.
(photo: courtesy of Nigel Cripps)
0-6-0ST MW2047 of 1926 'Warwickshire'
Freight train containg well wagon
loaded with saddletank, smokebox
and old boiler headed by BR class 33
No.33108 departing from SVR Bridgnorth
bound for Bewdley on Sunday
25th November 2018.
(photo: courtesy of Nigel Cripps)
0-6-0ST MW2047 of 1926 'Warwickshire'
Final view of saddletank, smokebox and
boiler departing from SVR Bridgnorth
bound for Bewdley on Sunday
25th November 2018.
(photo: courtesy of Nigel Cripps)
0-6-0ST MW2047 of 1926 'Warwickshire'
Well wagon containing Saddletank,
Smokebox and Old Boiler at SVR Bewdley
on Saturday 1st December 2018.
(photo: courtesy of SVR Wagons)
0-6-0ST MW2047 of 1926 'Warwickshire'
Centre and leading driving wheel sets at
SVR Bridgnorth on Sunday 9th December
2018 after being prepared for
final painting a week earlier.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH trailing axlebox assembly with keep
temporarily removed for the addition
of felt bearing pads at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH trailing axlebox keep with newly
installed felt bearing pads inserted
prior to refitting to axlebox at SVR
Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Hydraulic and manual screw jacks
provided to start frame lifting process
at SVR Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Screw lifting jacks in position under
rear buffer beam during the lifting
process in order to insert driving
wheel sets under frames at SVR
Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Hydraulic lifting jack under front
buffer beam being used to prepare
frames for insertion of driving wheel
sets under frames at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
WILT fitters getting ready to roll trailing
wheelset under frames by removing
front packing at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing wheelset being carefully rolled
under frames by WILT fitters at SVR
Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing wheelset being carefully rolled
under frames by WILT fitters at SVR
Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing wheelset in temporary position
under frames at SVR Bridgnorth on Sunday
9th December 2018. the rear springs and
horn straps will need to br removed prior
to final positioning and frames lowered.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Felt bearing pads in the process of being
added to the axle box keeps of centre
driving wheelset at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing and centre driving wheelsets
in temporary positions with packing
still under frames at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing and centre driving wheelsets
in temporary positions under frames
with packing still in place at
SVR Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Packing in the process of being inserted
under the frames with trailing and
centre driving wheelsets in temporary
positions at SVR Bridgnorth on
Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Hydraulic jack in position under front
buffer beam and packing under
frames after trailing and centre
driving wheelsets had been
rolled into temporary positions
at SVR Bridgnorth on Sunday
9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
LH Axlebox on leading wheelset in the
process of having felt bearing pad
added to keep at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Robin Jones fitting keep containing
felt bearing pad back into RH
trailing axlebox at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
General view of front buffer beam
with hydraulic jack still in place following
the rolling in of the trailing and centre
driving wheel sets with the remaining
leading wheelset awaiting its turn at SVR
Bridgnorth Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Final view of centre driving wheelset
under frames with packing and hydraulic
jack left in place with leading wheelset
ready to be rolled in at SVR Bridgnorth
on Sunday 9th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Work for the day completed WILT fitters
put their equipment away having managed
to prepare all three wheelsets (inserting
felt pads in keeps of axleboxes) and rolling
two wheelsets under frames at SVR
Bridgnorth on Sunday 9th December 2018.
(photo: David Cooke)
MW2047
SVR Bridgnorth 20.12.18
photo: LMS2968
MW2047
SVR Bridgnorth 20.12.18
photo: LMS2968
0-6-0ST MW2047 of 1926 'Warwickshire'
Leading driving wheelset ready to be
rolled under frames (after painting
the previous Sunday by Robin Jones)
at SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Underside of new cylinder block (after
painting by Robin Jones the previous
Sunday) at SVR Bridgnorth on
Sunday 30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Trailing wheelset in correct position
under frames after removal of springs
at SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Centre driving wheelset being manouvered
to allow cranks and eccentrics to pass
under motion bracket at SVR Bridgnorth
on Sunday 30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Centre driving wheelset being manouvered
to allow cranks and eccentrics to pass
under motion bracket at SVR Bridgnorth
on Sunday 30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Packing being re-positioned prior
to leading wheelset being rolled
into position under frames at
SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Wilt fitting team (L to R Andy Poole,
Carl Jones, Mike Hill, Richard Cooke
and Robin Jones ready to roll
leading wheelset under frames
at SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Leading driving wheelset being
rolled under frames at SVR
Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
All three wheelsets in correct positions
under frames at SVR Bridgnorth
on Sunday 30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
View under frames of leading wheelset
correctly positioned prior to removal
of hornstraps and fitted bolts at
SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH leading horns with strap and fitted
bolts removed prior to lowering
frames to engage with axlebox
at SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
Set of fitted bolts removed from frames
to allow horn straps to also be
removed prior to lowering
frames onto wheelsets at
SVR Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
RH trailing axlebox in position prior to
frames being lowered at SVR Bridgnorth
on Sunday 30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
View of RH trailing axlebox engaged
in horns but not fully lowered at SVR
Bridgnorth on Sunday
30th December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
with frames located on axle boxes
(but not yet fully lowered) at SVR
Bridgnorth on Sunday 30th
December 2018.
(photo: David Cooke)
0-6-0ST MW2047 of 1926 'Warwickshire'
With frames located on axle boxes
(but not yet fully lowered) at SVR
Bridgnorth on Sunday 30th
December 2018.
(photo: David Cooke)